At $1.62 1/2 a cord, what will be the cost of a pile of wood 24ft long, 4 ft wide 6 ft, 3 in high?
A cord is 128 cu ft, so 1/2 cord is 64 cu ft. 3 in is 1/4 ft
(24*4*6)/4 = 144 cu ft
This is 2* 1/2 cord 2*1.62 = 3.24
plus 16 cu ft 16/64 = 2/8 = 1/4
1.62/4 = .40
3.24 + .4 = $3.64